Roof Replacement Cost Calculator

Build a full replacement estimate from the rates you control: material, labour and tear-off, plus fixed extras, waste and contingency. The result is a total and a fully loaded cost per square.

Quick answer: 1,600 sq ft at $3.50 material, $2.25 labour and $0.75 tear-off, with $600 extras and 10% contingency, comes to $12,716 — $794.75 per square, including tear-off and contingency rather than just the covering.

  • Four rates, five cost lines
  • Tear-off and contingency separated
  • Cost per square for comparison

Replacement cost inputs and results

The default rates show the arithmetic rather than current prices, so replace them with a local quote before relying on the total.

What you'll need
  • Roof area (sq ft)
  • Material rate ($ per sq ft)
  • Labour rate ($ per sq ft)
  • Tear-off rate ($ per sq ft)
  • Fixed extras ($)
  • Material waste (%)
  • and 1 more below
Have these to hand before you start — the result updates as you type.
Estimated total
$12,716
16.0 squares · $794.75 per square · $11,560 before contingency
Material
$6,160
Labour
$3,600
Tear-off
$1,200
Contingency
$1,156

Contingency is applied after the subtotal, which is why the total is not simply the sum of the lines above it.

Show calculation

Replacement cost inputs and results explained

One measurement and six figures. Four of the inputs are rates, one is a lump sum and two are percentages applied at different stages.

InputWhat to enter, and where it comes fromUnitLimits in the calculator
Roof areaThe sloped area being covered, not the footprintsq ftAbove 0, up to 200,000
Material rateThe covering itself, per square foot$ per sq ft0 to $100
Labour rateInstallation labour, per square foot of roof$ per sq ft0 to $100
Tear-off rateRemoval and disposal, per square foot removed$ per sq ft0 to $50
Fixed extrasDumpster, disposal fees, small flashing — anything that does not scale$0 or more
Material wasteAllowance for offcut and lapping, applied to the material only%0 to 60
ContingencyAllowance for what is found once the covering is off%0 to 50
ResultWhat it meansUnit
MaterialArea with waste, multiplied by the material rate$
LabourArea, without waste, multiplied by the labour rate$
Tear-offArea multiplied by the tear-off rate$
ContingencyThe subtotal multiplied by the contingency percentage$
Total and per squareSubtotal plus contingency, and that total divided by the number of squares$ / $ per square

The four tiles are material, labour, tear-off and contingency — they deliberately leave out the fixed extras, so they do not add up to the total. The extras sit inside the subtotal and appear in the calculation panel rather than as a tile.

The calculator refuses an area above 200,000 sq ft, material or labour above $100 per sq ft, tear-off above $50 per sq ft, waste above 60% and contingency above 50%. It also refuses a job where all three rates are zero and there are no extras.

What this calculator works out

A replacement estimate is not one number, it is five: material, labour, tear-off, fixed extras and contingency. Each is driven by a different rate, and separating them is what lets you see which part of a quote is high.

This page builds all five from rates you enter, applies waste to the material quantity only, and reports the total with a cost per square for comparison.

It is a replacement, not a repair and not a recover. The covering comes off, so tear-off is a line in its own right and the contingency exists because nobody knows what the deck looks like until it does.

A house roof stripped back to the deck during a full replacement, with old covering removed and new materials stacked nearby.
A full replacement carries tear-off and contingency as well as the new covering. The total is several lines, not one rate.

How to use the Roof Replacement Cost Calculator

Seven fields and no calculate button. The estimate updates as you type.

Start with the area

The sloped roof area, not the footprint. On a pitched roof the surface is larger than the plan by the pitch factor — about 12% at 6:12 and 41% at 12:12 — so a footprint entered here understates every line.

Enter the three rates

Material and labour are the two that build the covering; tear-off is what removing the old one costs. Take all three from the same quote if you can, because mixing a material price from a supplier with a labour rate from a different contractor produces a figure no one has actually offered.

Add the fixed extras

The dumpster, the disposal fee, a length of flashing, a permit — anything that is the same whatever the roof size. These sit in the subtotal but are not shown as a tile, which is why the tiles do not add up to the total.

Set waste and contingency

Waste applies to the material only: the offcut is bought, but the installer is paid for the roof that gets built. Ten percent is a common allowance for a straightforward roof.

Contingency is the allowance for what is under the covering — rotted sheathing, a failed valley, a previous repair nobody mentioned. It is applied to the whole subtotal, including the fixed extras, so a 10% contingency adds 10% to a dumpster as well as to the shingles.

Read the result

The large figure is the total. The sub-line gives the squares, the cost per square and the subtotal before contingency — the last of those is what a contractor would quote before allowing for the unknown.

The four tiles show material, labour, tear-off and contingency separately. Material is usually the largest single line; tear-off is usually the one people underestimate.

Open Show calculation to see every line written out, including the extras that have no tile.

Saving and sharing the result

  • Copy results copies the total and the cost per square.
  • Share opens the device's share sheet where one exists, and otherwise copies the link.
  • Save image downloads a summary card as a PNG.
  • Print / PDF opens the print dialog with a report laid out for paper.
  • Cite and Embed open panels with a citation and an iframe snippet respectively.
  • Reset returns every field to the default example.

If the calculator refuses a figure

An out-of-range entry hides the results and shows a "Check the input" message naming the field. The usual causes are an area of zero, a rate above the allowed maximum, and a waste or contingency figure beyond its limit.

Correct the field and the result returns immediately. While the input is invalid the action buttons refuse to act, so a bad figure cannot be copied or printed by mistake.

Formula and calculation logic

squares = A ÷ 100
material = A × (1 + W ÷ 100) × M
labour = A × L
tear-off = A × T
subtotal = material + labour + tear-off + E
contingency = subtotal × (C ÷ 100)
total = subtotal + contingency
per square = total ÷ squares

Variables

A
Sloped roof area, in square feet.
M, L, T
Material, labour and tear-off rates, in dollars per square foot.
E
Fixed extras, in dollars.
W
Material waste, as a percentage.
C
Contingency, as a percentage.

Unit explanation

Three per-square-foot rates multiply an area to give dollars; the extras are already dollars; the two percentages are applied to different bases and never to each other. Nothing compounds, and the only conversion is area to squares, where one square is 100 square feet.

That the percentages have different bases is the thing to hold on to. Waste multiplies the area, so it changes a quantity. Contingency multiplies the subtotal, so it changes a price.

Why waste applies to material only

Because waste is a material allowance. The offcut is bought, so it belongs in the material line; the installer is paid for the roof that gets built, not for the panel that gets cut off. Tear-off is measured on what comes off the roof, which is the net area.

Applying waste to all three would overstate the job by roughly the waste percentage of the labour and tear-off lines — on the default example that would be about $480 that nobody spends.

Why contingency is applied to the subtotal

Because it is an allowance against the whole job rather than against one line. Applying it to the subtotal rather than to the total is what stops it being a percentage of itself, which would be circular.

There is a consequence worth knowing: because the fixed extras are inside the subtotal, contingency is charged on them too. On the default example, 10% contingency adds $60 to a $600 dumpster that is not going to cost any more than $600. It is a small overstatement, and it is deliberate — the alternative is a model with two subtotals and a rule about which one the percentage applies to.

Numerical example

1,600 sq ft at $3.50 material, $2.25 labour, $0.75 tear-off, $600 extras, 10% waste and 10% contingency:

material
1,600 × 1.10 × $3.50 = $6,160
labour
1,600 × $2.25 = $3,600
tear-off
1,600 × $0.75 = $1,200
subtotal
$6,160 + $3,600 + $1,200 + $600 = $11,560
contingency
$11,560 × 0.10 = $1,156
total
$12,716
per square
$12,716 ÷ 16.0 = $794.75

Nothing is rounded between steps, and the display shows whole dollars.

Result interpretation

The total is a fully loaded figure: it carries tear-off, the fixed items and the contingency as well as the covering. That makes it the right number for a budget and the wrong number to hold directly against a quote that covers only material and labour.

The five lines

Material scales with area plus waste. It is the line most sensitive to product choice, and the one where a cheap quote usually shows. At the defaults it is 53% of the subtotal, which makes it the largest single line.

Labour scales with area at a rate that reflects pitch, complexity and local wages. It is the line most sensitive to region, and at the defaults it is 31% of the subtotal.

Tear-off scales with what has to come off. One layer is cheap; three layers, or a roof with a second covering over the first, is not. At the defaults it is 10% of the subtotal — and it is the line most often left out of a homeowner's mental estimate.

Fixed extras do not scale. A dumpster, a disposal fee, a length of flashing — they are the same whatever the roof size, which is why they are a lump sum rather than a rate.

Contingency is the allowance for what you cannot see until the covering is off.

Material is the biggest line; labour is the one that varies. Material prices are broadly comparable between contractors because they buy from the same suppliers. Labour rates and crew productivity are not, which is why two quotes for the same specification usually differ on the line that is not the largest.

What the cost per square includes

The per-square figure is the total divided by the number of squares, so it is fully loaded: tear-off, extras and contingency are all inside it. It is not a covering price.

That matters when you compare it with a quote. A contractor quoting "$600 per square" may mean material and labour only, with tear-off and disposal separate — which is a different quantity from the $794.75 here. Before deciding a quote is cheap, check what its per-square figure carries.

The clean comparison is against another fully loaded figure. If you have a quote that itemises, add its lines up the same way this page does and divide by the squares; then the two numbers are measuring the same thing.

Where the rates come from

Each covering has its own rate, and the calculators for them are separate because the rate structures differ: the shingle cost estimator, the tile roof cost estimator and the metal roof cost estimate. If you have not chosen a covering yet, the roof material comparison calculator compares two on cost per year of life before you commit to a rate here.

Roofing materials stacked on a driveway beside a house being re-roofed, with bundles, a dumpster and offcuts.
Material and disposal sit at opposite ends of the job. The dumpster is a fixed extra; the bundles scale with area.

Worked examples

Example 1 — 1,600 sq ft, single layer tear-off

Inputs
1,600 sq ft, $3.50 material, $2.25 labour, $0.75 tear-off, $600 extras, 10% waste, 10% contingency
Squares
1,600 ÷ 100 = 16.0
Material
1,600 × 1.10 × $3.50 = $6,160
Labour
1,600 × $2.25 = $3,600
Tear-off
1,600 × $0.75 = $1,200
Subtotal
$6,160 + $3,600 + $1,200 + $600 = $11,560
Contingency
$11,560 × 10% = $1,156
Total
$12,716
Per square
$12,716 ÷ 16.0 = $794.75

The per-square figure is the one to hold on to. A quote for this roof at $600 per square is low; at $1,000 it is high — provided both are fully loaded, which is the check described above.

total = $12,716; $794.75 per square

Example 2 — the same roof with no tear-off and lower contingency

Change
tear-off $0.00, contingency 5%, everything else as Example 1
Subtotal
$6,160 + $3,600 + $0 + $600 = $10,360
Contingency
$10,360 × 5% = $518
Total
$10,878
Per square
$679.88
Saving
$1,838 against Example 1

An overlay instead of a strip saves the tear-off and some contingency. Whether that is wise depends on how much life the existing covering has left, which is a judgement rather than an arithmetic result.

total = $10,878; $679.88 per square

Example 3 — two layers to strip

Change
tear-off $1.50 instead of $0.75, everything else as Example 1
Tear-off
1,600 × $1.50 = $2,400
Subtotal
$6,160 + $3,600 + $2,400 + $600 = $12,760
Contingency
$12,760 × 10% = $1,276
Total
$14,036
Per square
$877.25

Doubling the tear-off rate adds $1,320 to the total — more than the $1,200 of extra tear-off itself, because contingency is charged on it too. A second layer of covering is a bigger decision than it looks.

total = $14,036; $877.25 per square
WasteMaterialSubtotalTotalPer square
0%$5,600$11,000$12,100$756.25
5%$5,880$11,280$12,408$775.50
10%$6,160$11,560$12,716$794.75
15%$6,440$11,840$13,024$814.00
20%$6,720$12,120$13,332$833.25

Example 1's figures throughout, changing only the waste allowance. Each 5% of waste adds $280 of material and $308 to the total, because contingency is charged on the increase.

Limitations and assumptions

  • Rates are yours. The defaults are illustrative, not market data.
  • No access or height loading. A steep or high roof costs more than the same area on a bungalow.
  • No structural work. Rotten decking and failed framing come out of contingency, not out of this arithmetic.
  • No gutters, fascia or soffit. Separate trades with linear pricing.
  • No permit or inspection fees. Those sit outside the job cost.
  • No margin. A contractor's price carries overhead and profit on top of every line here.
  • One covering assumed. A change of roof type needs the matching cost page.
  • Not a quote. It does not include scheduling or site conditions.

The two exclusions that most often change a real figure are access and deck repairs. A roof that needs scaffolding, or one where the sheathing turns out to be rotten, can move well beyond anything the rates here will produce — which is why the contingency exists and why it is a percentage rather than a fixed sum.

Three related costs sit outside this page. If the roof is being changed rather than replaced in kind, the flat roof cost estimator covers a membrane system on a different basis. If it is being paid for over time, the roof financing estimator prices the borrowing. And where the existing covering is sound enough to coat rather than replace, the estimate polyurethane roof coating cost page covers that route.

Frequently asked questions

No. It is a budget built from rates you entered. It carries no overhead, no profit margin, no scheduling and no site conditions, all of which a contractor adds on top. Use it to check a quote or to see which line is driving one, not as a substitute for either.

Nowhere in particular. The $3.50 material and $2.25 labour rates are round figures chosen so the arithmetic is legible, not a market rate for any product or region. Replace them with a local quote before drawing any conclusion about cost.

Because it is priced on what comes off rather than on what goes on, and it varies independently of the new covering. A roof with one layer and a roof with three have the same covering cost and very different tear-off costs. Keeping it separate is what lets the difference show.

Whatever is found once the covering is off: rotted sheathing, a failed valley, a previous repair nobody mentioned, a chimney flashing that has to be rebuilt. None of it is visible from outside, which is exactly why it is an allowance rather than a line item.

No — enter the rate for the material as supplied, and let the waste field do the allowance. If you bake waste into the rate and also enter a waste percentage, it is counted twice. The calculator applies waste to the material quantity, which is where it belongs.

Because it is the figure that can be compared across roofs of different sizes and against a quote. A total tells you what this roof costs; a cost per square tells you whether it is expensive. The second is the one that survives a change of area.

No. They are separate trades priced by the linear foot rather than the square foot, and they are often replaced at the same time because the access is already there. Add them to the fixed extras if they are part of the job you are pricing.

Enough that no default rate is worth using. It shows up almost entirely in the labour line, because material is bought from national suppliers at broadly similar prices while wages and crew productivity are local. That is why the labour rate is the one to source most carefully.

Because the fixed extras have no tile. Material, labour, tear-off and contingency are shown; the extras sit inside the subtotal and appear only in the calculation panel. On the default example that is $600, which is exactly the gap between the four tiles and the total.

Yes. Contingency is applied to the subtotal, and the extras are part of it, so 10% contingency adds $60 to a $600 dumpster that will not cost any more than $600. It is a small overstatement and it is deliberate: the alternative is a model with two subtotals and a rule about which one the percentage applies to.

A square is 100 square feet of roof surface, and it is the unit coverings are sold and labour is quoted in. The calculator reports cost per square because that is the figure a contractor's quote will be expressed in, so the comparison can be made without converting anything.

Because the tear-off rate roughly doubles and the contingency is charged on the increase. On the default example, moving from $0.75 to $1.50 a square foot adds $1,200 of tear-off but $1,320 to the total. More layers also mean more weight to strip, more disposal and a longer job.

Where these numbers come from

Every figure on this page comes from a rate you enter. The page does not contain a price list and does not claim one.

The default rates are illustrative: they were chosen to make the arithmetic legible, not to reflect what anything costs where you live. Material comes from a supplier's price per square foot, labour from a contractor's rate for your roof's pitch and your area, and tear-off from what removal and disposal cost locally for the number of layers you have.

One external source supports the structure of the estimate:

  • Asphalt Roofing Manufacturers Association — Re-Roofing: Replacement vs Recover — the source for what a replacement actually consists of. It defines roof replacement as the process of removing the existing roof covering, repairing any damaged substrate, and installing a new roof covering. Those are three distinct pieces of work, and they are why this page carries a tear-off line and a contingency rather than a single rate: the substrate cannot be assessed until the covering is off, which is precisely what the contingency is for.

That is industry guidance on what the work involves, not a price. No source is cited for the rates themselves, because the page does not assert any — the defaults are labelled illustrative wherever they appear.

Comparing coverings?

Material rates differ enough that the same roof can be priced three ways. The material-specific pages use their own line items.

Scroll to Top