Shingle Replacement Calculator

The installed cost of replacing shingles, not just the bundle count: covering, underlayment, tear-off by layer, labour and disposal, at your own rates.

Quick answer: 2,000 sq ft with 10% waste needs 67 bundles and 6 rolls of underlayment. With one layer to strip, the job comes to $8,378 — $2,678 material, $4,200 labour, $900 tear-off and $600 disposal, or $4.19 per sq ft.

  • Bundles and underlayment rolls
  • Tear-off costed by layer
  • Cost per square foot

Shingle replacement inputs and results

Set layers to zero for a new build with nothing to strip.

Cost stackmaterialslabourothertotal
Enter the materials and the labour; the total above adds the rest. → installed cost
Installed cost
$8,378
$4.19 per sq ft · 20 squares · 1 layer stripped
Bundles
67
Underlayment rolls
6
Material
$2,678
Labour
$4,200
Tear-off
$900
Disposal
$600

Shingle scope only; starter strip, ridge cap, flashing, ventilation, permits and tax are excluded.

Show calculation

What this calculator works out

Most shingle estimators stop at the bundle count. That is the right answer to a narrow question — how much material to order — and the wrong answer to the one people actually ask, which is what the job costs.

This page prices the whole installed scope. Covering bundles and underlayment rolls are derived from the roof area with a waste allowance. Labour is charged per square of new covering. Tear-off and disposal are charged per square of old covering, multiplied by the number of layers being removed. The result is a total and a cost per square foot.

If you only want quantities, the Shingle Calculator covers field bundles, starter strip and ridge cap. This page picks up where that one stops.

Two things sit outside this page. If the roof is open to the weather now, the immediate question is stopping water rather than choosing a covering, and the emergency roof repair cost calculator covers that temporary work. And if replacement may not be necessary at all, you can estimate the roof repair cost for the failed area first — a repair that buys several years is sometimes the cheaper route.

A roof stripped back to bare decking during a shingle replacement, with old covering stacked at the edge.
Tear-off is charged per square of old covering per layer, which is why the layer count changes the bill so much.

The ten inputs and the eight results

Six of the ten inputs are rates or product specifications you can look up. Four are judgements about the building: the area, the waste allowance, the number of layers, and the slope that decides the underlayment.

InputUnitWhat it isWhere the number comes from
Roof areasq ftThe sloped surface to be coveredA measurement of the roof planes, or a footprint converted with the pitch factor
Waste%Allowance for cuts, offcuts and breakageYour judgement; 10% is common on a simple gable, more on a cut-up roof
Bundle coveragesq ftArea one bundle coversThe shingle wrapper or product data sheet
Bundle price$Price of one bundleSupplier or merchant quote for the product you intend to buy
Roll coveragesq ftArea one underlayment roll coversThe underlayment data sheet — adjust for the slope as described below
Underlayment roll$Price of one rollSupplier quote
Layers to stripcountExisting covering layers being removedCounted at an edge or a valley; zero for a new build
Tear-off$/square/layerRemoval rate for one square of one layerA contractor quotation, stated per layer
Labour$/squareInstallation labour for one square of new coveringA contractor quotation for your area and pitch
Disposal$/square/layerRemoval and tipping of one square of one layerThe hauler's rate, or the contractor's line item

No currency selector and no unit conversion: enter every cost in the same currency and every area in square feet. The waste allowance is capped at 40%, and the layer count at 5, because beyond that the roof is a rebuild rather than a strip.

ResultUnitWhat it means
Installed cost$The four cost lines added together: material, labour, tear-off and disposal
Cost per sq ft$/sq ftThe installed cost divided by the roof area, for comparing quotes of different sizes
BundlescountWaste-adjusted area divided by bundle coverage, rounded up to whole bundles
Underlayment rollscountWaste-adjusted area divided by roll coverage, rounded up to whole rolls
Material$Bundles × bundle price, plus rolls × roll price
Labour$Squares of roof × labour rate. Charged on the roof area, not on the waste-adjusted area
Tear-off$Squares × layers × tear-off rate
Disposal$Squares × layers × disposal rate

Labour scales with the area covered; tear-off and disposal scale with the area removed, which is the area multiplied by the number of layers. That difference is why the layer count changes the bill without changing the roof.

How to Use the Shingle Replacement Calculator

There is no calculate button. Every field feeds the result directly, so the total, the four cost lines and the cost per square foot all move as you type. Work down the form once and the arithmetic takes care of itself.

  1. Enter the roof area. This is the sloped area of the surface being covered, not the footprint of the building. If you only have the footprint, convert it first — a 6:12 roof has about 12% more surface than its plan.
  2. Set the waste allowance. Ten percent is a normal starting point for a simple gable. A roof with several valleys, hips or penetrations needs more, because every cut produces an offcut.
  3. Enter the bundle coverage and price. Both come from the wrapper or the product data sheet, not from a rule of thumb. Coverage per bundle varies by product, so check the one you are buying.
  4. Enter the roll coverage and price for underlayment. Read the slope section below first: on a shallow roof the required number of layers changes, and that changes the effective coverage per roll.
  5. Enter the layers to strip, with the tear-off and disposal rates. Set layers to zero for a new build with nothing to remove. Count the layers at an edge or a valley rather than from the ground.
  6. Read the four cost lines, not just the total. Material, labour, tear-off and disposal are shown separately so you can see which one is driving the job. Show calculation displays the arithmetic behind each figure.

An empty field, a negative rate, or a service coverage of zero produces an error under that field and withholds the result, rather than printing a number the job cannot support.

The formulas

squares = area ÷ 100
waste area = area × (1 + waste ÷ 100)
bundles = ⌈ waste area ÷ bundle coverage ⌉
rolls = ⌈ waste area ÷ roll coverage ⌉
material = bundles × bundle price + rolls × roll price
labour = squares × labour per square
tear-off = squares × layers × tear-off per square
disposal = squares × layers × disposal per square
total = material + labour + tear-off + disposal
cost per sq ft = total ÷ area

Quantities: squares, waste area, bundles and rolls

Formula. Squares = area ÷ 100. Waste area = area × (1 + waste ÷ 100). Bundles = ⌈waste area ÷ bundle coverage⌉. Rolls = ⌈waste area ÷ roll coverage⌉.

Variables. Area in square feet of sloped roof; waste as a percentage; bundle and roll coverage in square feet per unit. The ceiling brackets mean round up to the next whole unit, because a part-bundle and a part-roll are both bought whole.

Why it is calculated this way. Waste is applied once, to the area, and both quantities are derived from that same adjusted area. Applying waste separately to bundles and to rolls would let the two drift apart, and it would double-count the offcut that both products share.

Example. 2,000 sq ft at 10% waste: squares = 20, waste area = 2,200. Bundles = ⌈2,200 ÷ 33.3⌉ = 67. Rolls = ⌈2,200 ÷ 400⌉ = 6.

Reading the result. The two quantities round up independently, so the surplus differs between them. Rounding the combined total instead would under-order one of the two products.

Cost lines: material, labour, tear-off and disposal

Formula. Material = bundles × bundle price + rolls × roll price. Labour = squares × labour per square. Tear-off = squares × layers × tear-off per square. Disposal = squares × layers × disposal per square.

Variables. Squares as calculated above, layers as a whole count, and the three rates in currency units. Labour uses the unadjusted squares; tear-off and disposal use squares multiplied by layers.

Why it is calculated this way. Labour is paid on the area of new covering laid, so it does not grow with what was underneath. Removal work does: every additional layer is another layer to pry up, carry down and tip. Multiplying only the removal lines by layers is what makes a second layer visible in the total.

Example. Material = 67 × $38 + 6 × $22 = $2,678. Labour = 20 × $210 = $4,200. Tear-off = 20 × 1 × $45 = $900. Disposal = 20 × 1 × $30 = $600.

Reading the result. On a single-layer roof the four lines are usually ordered material, labour, tear-off, disposal. On a three-layer roof tear-off and disposal can overtake the material line, which is the signal that the strip is the job.

Installed cost and cost per square foot

Formula. Total = material + labour + tear-off + disposal. Cost per square foot = total ÷ area.

Variables. All four cost lines in currency units; area in square feet. The result is currency per square foot of roof, not per square foot of building.

Why it is calculated this way. A single total cannot be compared between roofs of different sizes, so the total is divided back by the area. That gives a figure you can hold against another quote, a published range, or a previous job.

Example. $2,678 + $4,200 + $900 + $600 = $8,378. Over 2,000 sq ft that is $4.19 per sq ft.

Reading the result. Because both quantities are rounded up, the cost per square foot carries a small rounding surplus. It falls as the roof gets larger, which is one reason a small roof costs more per square foot than a big one at identical rates.

Why the layer count changes the bill so much

Covering a roof takes the same time regardless of what was underneath. Stripping it does not. Two layers means twice the material to pry up, twice the volume to carry down and twice the weight in the container.

That is why tear-off and disposal are multiplied by layers while labour is not. A three-layer roof can carry more cost in removal than in installation, and it is the single most common reason two quotes for the same roof area differ by a third.

There is a practical limit as well. Many coverings cannot be re-covered over more than two existing layers, and some jurisdictions restrict it further, so a third layer usually means a full strip whether the arithmetic likes it or not.

Check for a third layer before you price. Layers are counted at an edge or a valley, not from the ground. A quote built on one layer when there are three is wrong by more than the labour line. A roof inspection settles the count before the quotation is written.
A new course of asphalt shingles being laid on a roof deck, with the exposure line visible across the course.
New covering is the part everyone prices. On a multi-layer roof, removing the old one can cost more.

Underlayment, slope and the roll count

The roll count is the figure most often wrong on a quote, because it depends on the slope as well as on the product. On a shallow roof the underlayment is specified in layers, and two layers means twice the coverage for the same area.

Roof slopeWhat the underlayment has to beWhat to enter as roll coverage
Below 2:12Asphalt shingles are not an appropriate covering at this slopeNot a shingle replacement — this calculator does not apply
2:12 up to 4:12A double layer of mechanically fastened underlayment, or a single layer of self-adhering membraneHalve the stated coverage for two mechanically fastened layers, or use the self-adhering product's own figure
4:12 and aboveA single layer, lapped to the manufacturer's instructionsThe product's stated coverage per roll

The slope thresholds and the double-layer requirement are set out by the Asphalt Roofing Manufacturers Association, which points to section R905.1.1 of the 2024 International Residential Code for the underlying requirement. Local codes and the product instructions override this table.

Two things follow. A roof between 2:12 and 4:12 can need twice the underlayment of a steeper roof of the same area, and the calculator will not warn you — it only divides by the coverage you enter, so a halved coverage is how you express the second layer. And a self-adhering membrane over the whole deck acts as a vapour retarder, which makes adequate ventilation part of the same decision.

The deck itself sits outside this calculator. Underlayment is laid on a sound surface, so if the sheathing is soft or delaminated that is a separate scope: the roof sheathing estimator prices the panels before you add them to this total.

Worked examples

Example 1 — 2,000 sq ft, one layer, 10% waste

Squares
2,000 ÷ 100 = 20
Waste area
2,000 × 1.10 = 2,200 sq ft
Bundles
⌈2,200 ÷ 33.3⌉ = 67
Rolls
⌈2,200 ÷ 400⌉ = 6
Material
67 × $38 + 6 × $22 = $2,678
Labour
20 × $210 = $4,200
Tear-off
20 × 1 × $45 = $900
Disposal
20 × 1 × $30 = $600
Total
$8,378 — $4.19 per sq ft
total = 2,678 + 4,200 + 900 + 600 = $8,378

Example 2 — the same roof with two layers to strip

Material
unchanged at $2,678
Labour
unchanged at $4,200
Tear-off
20 × 2 × $45 = $1,800
Disposal
20 × 2 × $30 = $1,200
Total
$9,878 — $4.94 per sq ft

The second layer adds $1,500, or 18% of the original total, without changing a single square foot of new covering. That is the whole reason the layer count has to be established before the quote, not after the strip begins.

total = 2,678 + 4,200 + 1,800 + 1,200 = $9,878

Once you have the installed cost, the next question is whether to spend it at all. If repair or replace your roof is still an open question, that comparison puts a repair against a replacement on an annualised basis and finds the year the repair stops paying.

Limitations and assumptions

  • Shingle scope only. Starter strip, ridge cap, flashing, ventilation and gutters are excluded.
  • No deck repair. Soft decking found during tear-off is priced per sheet separately.
  • No access costs. Scaffolding, lifts and steep-slope premiums are not modelled.
  • Uniform area assumed. A roof with several planes needs the total sloped area, not the footprint.
  • No permits, tax or container hire. Each is real and each depends on the site.
  • Slope is not read. The calculator does not know your pitch, so it cannot tell you that a roof between 2:12 and 4:12 needs two underlayment layers. Halve the roll coverage to express that.
  • One labour rate. Steep, cut-up or multi-level roofs take longer per square. Enter a rate that reflects the actual roof, or the labour line will come out low.
  • Rates are yours. No market price is applied anywhere.

Frequently asked questions

The Shingle Calculator is a materials take-off: field bundles, starter strip and ridge cap, with no underlayment, no labour and no cost. It answers "how much shingle do I buy". This page answers "what does the replacement cost". It adds underlayment, tear-off, labour and disposal, and returns a total. If you already have a bundle count and only need the installed cost, this is the page.

Because it scales differently. Labour is charged per square of new covering laid; tear-off is charged per square of old covering removed, multiplied by the number of layers. A single-layer roof and a three-layer roof take the same time to cover and three times the time to strip. Folding them into one rate would make the second and third layers free.

Yes. Underlayment is cut and lapped like the covering, so it carries the same waste. The calculator applies the waste factor to the area once and derives both quantities from it, which keeps the two consistent. If your underlayment laps are unusually generous, raise the waste figure rather than treating the roll count separately.

Because each is bought as a whole unit. A roof needing 66.1 bundles requires 67, and a roof needing 5.5 rolls requires 6. Rounding the total instead of each line would under-order one of them. The surplus is shown indirectly through the cost per square foot, which rises slightly as the rounding losses grow.

No. They are linear items measured along eaves, rakes, ridges and hips, and they belong in the material take-off rather than the installed cost. If you need them, use the Shingle Calculator for those quantities and add their cost to the material figure here.

Because prices vary by product, region and season, and a default would be an invented market rate presented as fact. Every rate on this page is an input. Take the bundle price from the product you intend to buy, and the labour rate from a quotation for your area.

Cutting losses at hips, valleys, rakes and penetrations, plus breakage and the offcut at the end of each course. Ten percent is a common starting point for a simple gable; a cut-up roof usually needs more. It does not cover damage discovered under the old covering, which is a separate scope.

No. Soft or delaminated decking is found during tear-off, not before it, and it is priced per sheet. The plywood replacement calculator prices that work, and the two totals can be added.

Enter the patch area instead of the roof area. Set tear-off layers to 1, and reduce or zero the underlayment if the patch does not disturb it. Be aware that the labour rate per square for a small patch is usually higher than for a full roof, because setup and travel are spread over less work. Use a patch rate if you have one.

Permits, dumpster delivery and collection, scaffolding, chimney and skylight flashing, ventilation, gutter work and tax. Each is a real cost on most jobs and each depends on the building. Treat the total as the shingle scope, not the project cost.

Where these numbers come from

Every rate on this page is an input. The arithmetic is area conversion, rounding up, and four multiplications added together. No market price is applied.

The default bundle coverage of 33.3 sq ft corresponds to the common three-bundles-per-square convention, which is a property of the product rather than a rule. Check the wrapper: coverage per bundle varies between products and profiles.

The slope thresholds and the double-layer underlayment requirement are an industry position, not a figure invented here. Underlayment is required in a replacement as well as in new construction, and codes specify it rather than leaving it to preference.

  • Asphalt Roofing Manufacturers Association, Steep Slope Roofing Underlayment, technical bulletin, 6 May 2025 — for underlayment types and specifications, the double-layer requirement on 2:12 to 4:12 slopes, the vapour-retarder effect of self-adhering membranes, and the reference to IRC R905.1.1.
  • Asphalt Roofing Manufacturers Association, Installation of Asphalt Shingles on Lower Sloped Roofs, technical bulletin, 14 July 2025 — for the lower limit of shingle use at 2:12 and the special procedures required between 2:12 and 4:12.
  • The shingle wrapper or data sheet, for coverage per bundle and the number of bundles per square.
  • The underlayment data sheet, for roll coverage and the lap required at the roof pitch.
  • Covering manufacturers' installation instructions, which also set the maximum number of layers and the deck preparation required.
  • Local waste and disposal requirements, which affect the container and the disposal rate.

Deciding whether to replace at all?

Compare the annualised cost of another repair against replacing now.